For plain cement concrete we want use 20mm aggregate are 40mm
mm aggregate
Answer Posted / siva
IF the requirement is in footing level, 40mm may be used. If
it is in slab level (raft), 20mm may be used. Either way,
both can be used for PCC as per the specific requirement.
Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Why are steel plates inserted inside bearings in elastomeric bearing?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What is the standard volume of pharma in cub ft
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What do you mean by tolerance factor of concrete ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to fix toll charge for a particular vehicle at toll booths in a highway?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
any book or article on pumped concrete.