What are the Defect Status in HP Quality Center?
Answer Posted / pooja
1) New
2) Open/Assigned
3) Scheduled/Delivered
4) Fixed
5) Returned/Rejected
6) Cancelled
7) Retest
8) Retest complete
9) Retest Failed
10)Retest Passed
11) Closed
12) Deffered
13) Duplicate
14) Reopened
| Is This Answer Correct ? | 7 Yes | 11 No |
Post New Answer View All Answers
I have 6 months experience as project tarine and one and a half year experience as software engineer.Should i write taht my total experience id 2 years.
Hi,Please can any one tell me about SAP Testing concepts.
In what situation would you want to parameterize a text verification check?
can anyone tell me the questions that can be posed in an interview for a 5 year experienced person in manual testing
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
1. what is a date guidelines ?
How to test an application if it was already developed and it is in the state of changing the functionality according to the customer requirement How to start testing in this situation. I got an application to test.It is a desktop application.It is still developing and started 8 months back.how can i start to test this application? Is it the right way to test it in "Random testing"? or writing the testcases from page one and executing them.i have an another responsibility that is I have to automate that application. can anyone tell me what is the process to test this application.
What is agile testing and why is it important?
How do you test a web application for dump and deaf??
what is conditional testing? explain and examples
tell me 3 defects in FRS document, while doing FRS review which u have found in the last 3 years ? could u plz answer brahma412@yahoo.co.in
How can you prepare the resume for testing? Can you send me the answer for this questions?
Hi Friends, I have completed 3 rounds of an Interview with HR discussion also and got Offer letter from Cognizant, but after in 30 min they send one more email like Offer is on Hold, and its not valid... Could you please guide me any one , Can i expect Offer again from Cognizant or Can i drop the hopes ?.
Write 2 scenarios for Integration testing? Please let me know its urgent.
Explain the manual testing process?