What is the different kinds of support?
Answer Posted / amit debnath
THERE ARE THREE KINDS OF SUPPORT .
1. ROLLER SUPPORT.
2. HINGED SUPPORT.
3. FIXED SUPPORT.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
how to find out hard strata in bored pile when the DMC method adopted.
what is difference between fluidity and workability also how palsticizer works
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What is chemical composion test
Form where IS456 is adopted in 1978?
satart to end steps by step process of building construction...? i want to planning theme accuretly
what does the track parameter mean in staad.pro?
difference between trapezoidal and pedestal footing and how the load acts on that
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
What is the standard volume of pharma in cub ft
What is a projection line?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
what is the weight of 10mm,20mm,40mm aggregate
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How much cement,sand,bricks and water needed for 1square metre brick work?