how you calculate the qty. of cement ,sand,aggregate from
proportion 1:2:4 M15
Answer Posted / sindhumani
To find the individual ratio of materials we have to use one
formula,
Sand = 0.46% of cement
Aggre= 0.92% of cement
For ratio 1:2:4
to find cement qty: (0.46%/2)*1440kg= 331Kg
For ratio 1:3:6
to find cement qty: (0.46%/3)*1440kg= 221Kg
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What goals do you have in your career?
Who built the sears tower?
Explain what is the release of lien?
What is unit weight of normal concrete?
Design a rectangular channel.
What is the minimum size of the particles of silt soil?
How do you calculate load bearing capacity of a waffle slab?
why the profile of shell of natural draught cooling tower is hyperabolic.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
why we are useing plastic under the lean concrete?and whts the advantage?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How foundation is designed, Column design and beam design
60-70 grade of Bitumen is VG-30 ?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
length where bent up is made in slab of bridge from one end