Answer Posted / guest
there is no ratio for m50 grade concrete. it is fully based
on design mix. following steps should be followed while you
consider design mix.
Grade Designation = M-50
Type of cement = O.P.C-43 grade
Brand of cement = Vikram ( Grasim )
Admixture = Sika [Sikament 170 ( H ) ]
Fine Aggregate = Zone-II
Sp. Gravity
Cement = 3.15
Fine Aggregate = 2.61
Coarse Aggregate (20mm) = 2.65
Coarse Aggregate (10mm) = 2.66
Minimum Cement (As per contract) =400 kg / m3
Maximum water cement ratio (As per contract) = 0.45
Mix Calculation: -
1. Target Mean Strength = 50 + ( 5 X 1.65 ) = 58.25 Mpa
2. Selection of water cement ratio:-
Assume water cement ratio = 0.35
3. Calculation of water: -
Approximate water content for 20mm max. Size of aggregate
= 180 kg /m3 (As per Table No. 5 , IS : 10262 ). As
plasticizer is proposed we can reduce water content by 20%.
Now water content = 180 X 0.8 = 144 kg /m3
4. Calculation of cement content:-
Water cement ratio = 0.35
Water content per cum of concrete = 144 kg
Cement content = 144/0.35 = 411.4 kg / m3
Say cement content = 412 kg / m3 (As per contract Minimum
cement content 400 kg / m3 )
Hence O.K.
5. Calculation for C.A. & F.A.: [ Formula's can be seen in
earlier posts]-
Volume of concrete = 1 m3
Volume of cement = 412 / ( 3.15 X 1000 ) = 0.1308 m3
Volume of water = 144 / ( 1 X 1000 ) = 0.1440 m3
Volume of Admixture = 4.994 / (1.145 X 1000 ) = 0.0043 m3
Total weight of other materials except coarse aggregate =
0.1308 + 0.1440 +0.0043 = 0.2791 m3
Volume of coarse and fine aggregate = 1 – 0.2791 = 0.7209 m3
Volume of F.A. = 0.7209 X 0.33 = 0.2379 m3 (Assuming 33%
by volume of total aggregate )
Volume of C.A. = 0.7209 – 0.2379 = 0.4830 m3
Therefore weight of F.A. = 0.2379 X 2.61 X 1000 = 620.919
kg/ m3
Say weight of F.A. = 621 kg/ m3
Therefore weight of C.A. = 0.4830 X 2.655 X 1000 = 1282.365
kg/ m3
Say weight of C.A. = 1284 kg/ m3
Considering 20 mm: 10mm = 0.55: 0.45
20mm = 706 kg .
10mm = 578 kg .
Hence Mix details per m3
Increasing cement, water, admixture by 2.5% for this trial
Cement = 412 X 1.025 = 422 kg
Water = 144 X 1.025 = 147.6 kg
Fine aggregate = 621 kg
Coarse aggregate 20 mm = 706 kg
Coarse aggregate 10 mm = 578 kg
Admixture = 1.2 % by weight of cement = 5.064 kg.
Water: cement: F.A.: C.A. = 0.35: 1: 1.472: 3.043
Observation: -
A. Mix was cohesive and homogeneous.
B. Slump = 120 mm
C. No. of cube casted = 9 Nos.
7 days average compressive strength = 52.07 MPa.
28 days average compressive strength = 62.52 MPa which is
greater than 58.25MPa
Hence the mix accepted.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is the difference b/w full length and cutting length?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Will water damage concrete?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How much cement and sand required for 9"brick wall per square metre
can you give me the details of rate analysis of steel and concrete?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Which type of plywood & sizes using in construction projects ?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20