what is the difference between np2, np3 & np4 rcc pipes
Answer Posted / sjtbehera
yes i agree with Mr. surya v Kuchibhota.
thia is as per IS:458-1988
| Is This Answer Correct ? | 36 Yes | 10 No |
Post New Answer View All Answers
Material calculation of cm 1:6 for 1sqm
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Which is the direction of negative angle?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
what is pile and deam foundation
VAT and CST ? Which benefits for buyer ? Why benefits?
How to make a c++ program that converts any base to base 10?
residential buildings,mixing of concrete,structural,construction material,site handling.
how to control PQI (Project Quality Index)
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
construction workers how much time take one work or qty
how much used soil in 1 brick of standard size?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.