Answer Posted / ram
To resist SHEAR FORCE, To Hold the MAIN BAR in proper
position, toresist the buristing of Column & Beam
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
How much cement will require for 1Rmt Skirting laying
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
What do you mean by bond? What are the different types of bonds?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
psc girder detail
what is project?
How many lbs are there in a yard?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
wat would be the probable interview questions and GD topics for IOCL exam?
Define What is unit weight of normal concrete?