Answer Posted / bhaskar
M25:-(1:1:2)
M20:-(1:1.5:3)
M15:-(1:2:4)
M10:-(1:3:6)
M7.5:-(1:4:8)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the maximum number of course that can be laid according to IS code and the max height.
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
how to calculate quantity of bricks in circular manhole with examples.
Define Who designed the city of Washington DC?
what is moment-curvature relationship in semi rigid connections??
how to absorb to site basic corrections? which are the important correction?
Define What are the reasons for geotechnical site investigations in Uganda?
"Gates of the dams are generally designed of curved shape". Why?
Which brick is best for construction ,either fly ash or AAC BLOCKS
How to plan a project
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what is the difference b/w full length and cutting length?
How much quantity water should be placed in one cubic meter area?
How much cement and water required for cement selery????
Why should you show Client/Engineer activities clearly on the project plan?