what is the difference between np2, np3 & np4 rcc pipes
Answer Posted / surya v kuchibhotla
The classification is made based on the longitudinal and
spiral reinforcement and based on the three edge bearing
test loads. Also it depends on the reinforcement provided in
socket of pipes for rubber ring joint.
NP-1 Class pipes are unreinforced concrete, non pressure
pipes. These are used for drainage and irrigation use above
Ground level or in shallow trenches.
NP-2 class are reinforced concrete pipes, light duty and non
pressure pipes.
NP-3 class are Medium duty non-pressure pipes used for
drainage and irrigation use, for culverts carrying medium
traffic.
NP-4 class are Heavy duty, reinforced concrete pipes.Used
for drainage, Irrigation, culverts with heavy traffic and
are suitable even for Railway loading.
| Is This Answer Correct ? | 183 Yes | 7 No |
Post New Answer View All Answers
How to calculate unit weight of concrete for m40 grade.
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
how to design and calculate materail quantity for concrete speedbreaker ?
IS code for grade of concrete for bamboo lintel????
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What goals do you have in your career?
Can inverted beams used in pipes during construction?
How many pyramid in egypt?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
how to prepare site mix design