whose motors self starting synchronous or Induction motor?give
fact reason why not self starting another mother

Answer Posted / yogesh

Single phase induction motor or synchronous are motor not self starting motors. In case of 3 phase, induction motor is self starting one. Synchronous motor is not a self starting one. Reason: if 3 phase supply is applied to stator, the rotating magnetic field(RMF) is produced with sync speed which will induce the emf on the rotor and produce flux. The rotor flux interacts with stator flux and rotor will rotate to catch the speed of stator(rotating magnetic field speed i.e. Sync speed). In sync motor the rotor is either in salient or non salient pole. If 3 phase supply is given to stator, RMF is prodused. Apply DC supply to the rotor(LET Salient pole rotor with 2 poles). Now N , S poles are induced in rotor. If at one instance stator N pole is nearer to rotor S pole, at that time the rotor tries to move in clock wise direction (for eg.). Suddenly the stator poles(rmf) will move to the another portion of the stator. Let stator S Pole is nearer to rotor S pole, at that time rotor will try to move in anti clk wise direction because stator N pole is at exactly in opposite direction to that of rotor axis. Since RMF is rotating in sync speed the rotor can not move in both clk wise and anti clk wise direction. The result is both clk and anti clk torques get cancelled each other. The rotor does not rotate. To make the sync motor self starting we can provide damper windings on the pole faces of rotor that could act as induction motor at starting then after running of the rotor switch on the DC supply to rotor. Now magnetic locking takes place between stator poles and rotor poles. Now the motor runs in sync speed.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

state the disadvantages of carbon filament???

2366


What is the difference between Static and servo controlled voltage stablizer?

1632


What is steady state response?

665


In how we connect watt meter for open & short circuit test of a single phase transformer.

5622


State any two nuclear power stations in India, with their generating capacity.

1381






Dry type transformers

1398


what is the use of sdf?

1672


what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?

1339


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2366


how to test the turn ratio of 3 phase transformer using volt meter shoe the curcit diagram.

1838


What is size 00, 01, 1 etc., in HRC fuse types?

1838


High speed earth switch operation with diagram

1876


An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The rotor reactance at stand still is A 2 ohm B 1.25 ohm C 3.15 ohm D 2.25 ohm

1745


1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?

2279


Where is servomechanism used?

652