how can change 10mm dia @130c/c bar spacing to 8mm dia

Answer Posted / j.saminathan

(spacing/wt.of given rod)xwt.of rod to be changed=required
spacing

Is This Answer Correct ?    14 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how we calculate the vol.of wet concrete..?

1407


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1816


What is limit state method and working stress method and ultimate method

1130


what is c4x light weight cement blocks

5146


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

766






why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10192


How to get MEP technical,instaaltion & testing data for interview?

1603


I have an span length 16 ft c/c

1057


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2347


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1578


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1635


Why you are leaving present job?

1595


Define What is the origin of name Railway Sleepers?

816


Doul Bar reinforcement and details of drawing.

1917


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2232