How much percent dry volume consider for concrete
Answer Posted / maulik tripathi
1.54 % required for concrete.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Difference between pre-tensioning and post-tensioning.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
what are the ffactors you considered choosing the course?
how u design STAGING for Superstructure in BRIDGE construction?
How many feet are in 4 square yards?
How much quantity of rod binding work by a rod binder per day
What is the maximum strength of cub compress strength in one cub testing
what is high type road and low type roads
What is the difference between 53 grade and 43 grade cement
In cement concrete how to check a quality of material also proportion of material at site ?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
RR masonry rate analysis
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is the sugested procedure of water purification for public supply?