what are the checks to be performed while fixing a door and
a window frame..at site??
Answer Posted / nitin ghamdayan
plaster margin both side ,line and level
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what post do you prefer to work in this company and why do you think you can serve better in such position?
please briefly explain calculating or estimating steel quantity for a RCC column?
how much cost of single coat 20mm thick plastering per sqre meter
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
How to do bbs in excel format
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
How to determine thee cut length for steel reinforcement bars in R.C.C design
What you understand by building codes?
is concealed wiring a problem in fly ash brick wall?
why the profile of shell of natural draught cooling tower is hyperabolic.
Reinforcement details at hinged joint
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
What is braced excavation all about?
what is the difference between prime coat and tack coat in road construction