WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1
M3,10M2,1 TON RESPECTIVELY
Answer Posted / m.n.alam
Dear sir i want to know in which i.s.code this is mentioned. please tell me my e-mail is alambly@gmail.com
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
Define What is aggregate?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What applicable rate of wct in bihar
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
what is the list of building construction equipment & teir output?
What materials were used to build the golden gate bridge?
How do you calculate reinforcement weight of steel?
how to calculate quantity of bricks in circular manhole with examples.
what is the breaking strength of wall tiles
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
What is meant by autocad?
What are the reasons for geotechnical site investigations in uganda?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar