Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate cut bar length of steel reinforcement?

Answer Posted / satya.mvvs

it depends on dia, angle of bends and elongation of bar.

Generally it can be calculated as

Effective Length (L) of Bar - No of bends x 2d or 3d

For 45 degrees angle it may considered as 2d and
for 90 Degrees it may considered as 3d

In practically it may be applicable to higher dia bars only
(Above 12mm)

Is This Answer Correct ?    14 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2125


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2503


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1850


What is the crank length in the slab?

1078


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2619


How to build the floor to ceiling bookcase?

1483


how to control PQI (Project Quality Index)

10888


What are the responsibilities of a construction manager?

1308


How much cement is require in one sqft area in a G+3 residential construction.

2124


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

6903


How many lbs are there in a yard?

1228


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2147


Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..

1951


what is c4x light weight cement blocks

5675


What are the different types of runners?

1214