Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we calculate the amount of concrete in trapezoidal
footing?

Answer Posted / satya.mvvs

It can be find by averaging method

By averaging the width / length of the the footing

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why concrete barriers have curved surface profiles?

1420


undistributed samples are obtained by

2452


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

2430


give me the rate analysis for Bituminous Macadam and SDBC

7489


How many % we consider for lap for reinforcement for estimates

1874


what is tension footing?

2030


sir, whitch is the best book (writer name) for prepration of gate....

1719


What is demising walls?

1220


For a washout valve why are two gate valves required in normal practice?

1189


How do you calculate load bearing capacity of a waffle slab?

2734


Explain what is the release of lien?

1299


Define What is made from large rocks, which protects the base of cliffs?

1135


What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?

1215


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2314


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2502