Answer Posted / abadullah khan
it is used to check shear,and its provides unity tothe members
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Concrete cover for slab, column, beam and footing?
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is the crank length in the slab?
How can i do RCC rate analysis?
Explain what are the problems one might face while having a Cantilever balcony?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
pls mail some more tecnical qustions at msaranya2610@gmail.com
.5Ast
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.