how can we calculate the amount of concrete in trapezoidal
footing?
Answer Posted / prashant verma
if A is length and B is breath and H is total height of trapezoidal footing and a' and b' is size of column n h is trapezoidal portion height.
then total qty of concrete is=A*B*(H-h)+[{h/3{a^2+b^2+(ab)^1/2}]
where a=A*B
b=a'*b'
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What Reinforcements Are Used In The Process Of Prestressing?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
What is Architect-Prepared Contract?
What is a tensile strength? What is the tensile strength of wood?
Differentiate first angle & third angle projection?
brickwork labour rate per cum ?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Slump Values for works?
punj loyed and sapurjl palanjl
Explain what is structural frames or systems?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
how to calculate reinforcment in staircase cranked beam?
How can you distinguish between sorption, absorption and adsorption?