Answer Posted / jasen murmu
Drawing is the language of Engineer.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many time use of plywood shuttering and IS code
afe or not
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Define What is made from large rocks, which protects the base of cliffs?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
why are you joining in this (applied post) job and your aim for this job
What is Heavy Concrete & Normal Concrete
How to decide/consider the grade of bitumen for dbm.
How many cum of 9.5mm stone in 1 ton ?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
Formula for calculation volume of essentric footing
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
how much required strength of cement concrete bricks(size 230x115x75mm)
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor