What is the order of MIX Design of concrete?
a)Cement :Stone:Sand
b)Cement :Fine aggregate :Coarse Aggregate?
Answer Posted / suresh
(b) cement:fine aggregate:coarse aggregate
| Is This Answer Correct ? | 17 Yes | 1 No |
Post New Answer View All Answers
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
what is w/c ratio in dry lean concrete for m10 mix design
what is the difference between replacement of cement by groundnut shell ash
Forces in a Shear Wall are in plane or out of plane ?
Define What are the materials used in building a gravity dam?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Explain what is change order request?
What is a kip?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
Define absolute co-ordinates?
During reclamation how can the occurrence of mud waves can be rectified?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)