9*9 1:4:8 ratio using how to calculate the material for
40mm aggregate ,cement &sand please tell me answer
Answer Posted / ronak shah
first of all i m not understand 9*9.
so i consider 1m3
52% more shrinkage and wastage.
1.52m3
cement= 1.52/(1+4+8)=0.1169/(cement bag volume in m3)=
0.1169/0.0348= 3.35 bags so 168 kg/m3.
sand=1.52/(1+4+8)=0.1169*4=0.47m3
aggregate=1.52/(1+4+8)=0.1169*8=0.94m3
| Is This Answer Correct ? | 47 Yes | 5 No |
Post New Answer View All Answers
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Are you ready to relocate with your immediate family to United States as a new employee?
residential projects,structural.
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
What is limit state method and working stress method and ultimate method
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
what is floating slab foundation?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
pls give me ans to ACT formula cube testing porpuse
howto calculate the quantities of material used in fly ash brick after finding the volume??
what are the proper pipes for salt water line
questions with answers to face an interview of an civil engineer regarding RCC buidings
Explain moment of inertia and its importance.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm