How much used for sand per square meter in 12mm Thickness
Answer Posted / mahesh
if it is a saturated sand then 1*1*.0120=.012cum*1920kg/cum=23kg of sand if it is a dry sand then 1*1*.0120=.012cum*1780kg/cum=21.36kg.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What is proportion of PCC Grade G?
List out some of the software program that can be useful for architect?
In earth work 1300 cum soil how to calculate how many liters require in water
Spider cracks occur in beam bottom due to––
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
how calucate cement sand ratio for plstering
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
Time required for curing of wall tiles before fixing
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
i need gate exam civil engineering question papers with answers
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?