Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if i want to make a zero trim for mass flow meter the pipe line should be empty or i need to make it full? i really need the answer pls help me

Answer Posted / satishkumar

If you want to make a zero trim for MASS FLOW METER, the
pipe line filled with liquid or empty pipe line is not a
problem. main important thing is the flow rate must be zero
when ZERO TRIMING of the MASS FLOW METER.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Give 2 application of quartz crystal used for process parameter measurement.

1995


Hook up resistance decade box to temp.transmitter.

2257


whats the abbreviation of IOP? is it instrument of power or input open problem?

1141


How process line mpm calculation is done?

1392


How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?

1606


hiii.... can any one provide me previous years question paper of hindustan petroleum for instrumentation engineering???

1967


Coal mill Instruments Equipments for cement plant And process diagram ?

2907


I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..

1732


Explain operation of Haskel pump.

2137


A length of steel pipe is used to carry sea water to a desalination plant. An adequate corrosion allowance must be specified and indicated in the piping specification, which affects the _________________________ of the pipe

2231


what are the selections available in configuring a burnout protection of a controller? thanks

1951


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

2117


define feed forward control loop with example and drawing?

3192


give me the formula for analog to digital converter and also d to a converter

2825


What is megering????