difference between DCS @ SCADA system?
and how can use in field
Answer Posted / jigneshsolanki
THERE IS MAINLY TWO DIFFERENT BEETWIN dcs & scada SYSTEM
1) DCS system it self whole control system & SCADA system required plc for controlling.
2)dcs SYSTEM scan time is nearly 1sec & SCADA with PLC system scan time is in millisecond(depends on program).
3)DCS having Large I/O capacity with respect to SCADA with PLC system.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
plz send me general of ongc
few questions on RS 232,1 question on relationship of impedance and turns ratio, many questions on flowmeters
What is instrumentation measurement?
I have a Control VAlve having size of 2 ".Only the known parameter is Pressure drop . Its 2 Kg. Then How to calculate control valve sizing means Cv.
What is profibus?
Positioner usage.
How to calibrate displacer type level transmitter (chemtrol make )for level measurement in hotwell , LP & HP heater ?
send me last 5 years questions asked in rrb chennai, for section engineer
What happen if we install my pressure transmitter below the elevation of pipe in natural gas service?
in natural gas indirect water bath heater,how to prevent the problem of backfire from firetube during ignition...becoz of this backfire performance of wbh is going low.
any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.
how to connect transmitter measuring sulfur process? 1-by using long impulse line or 2- by using coated short impulse line
Programmable Logic control.
while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?
components of control circuit belongs to control valve