What is Leastcount of
1. Total station
2. Theodolite
3. Dumpy level
4. Plane Table
Answer Posted / vishal
Total station has from 1sec to 6sec.
Theodolite has from 6sec to 1min.
Dumpy Level has 6min and 5mm in height depends upon staff.
Plane table has 1D.
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How many % we consider for lap for reinforcement for estimates
What is the use of water table & Kreb stone for drain
how much cost of single coat 20mm thick plastering per sqre meter
Define What does civil status mean?
how to design and calculate materail quantity for concrete speedbreaker ?
What is specific gravity???
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
What is the worlds largest concrete dam?
what are the Task work of different labour.?
how to calculate mivan shuttering matrial
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
what is cross hair cursor?