while doing floring in a room,from where one can start
laying tiles.
Answer Posted / riddhi rawal
It should start according to the slope to be given.
Starting from higher side to lower side.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how many litres of enamel paint required for 5000 sft of site??
Can we use concrete of slump cone in cube casting in which we have already measured slump?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
Explain what is progress payment?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
difference between fc and fc'?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
Explain soil analysis?
what is the painting co efficient of slope roof tiles?
How to come 1.54 from dry to wet concrete?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
Cement consumption of one cubic meter of aerocon blocks masonry?