while doing floring in a room,from where one can start
laying tiles.
Answer Posted / riddhi rawal
It should start according to the slope to be given.
Starting from higher side to lower side.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is proportion of PCC Grade G?
Explain the various stages of the project planning process in construction?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
Define block?
what is the service corridor?
Which are the top apps for you civil engineer?
What is different between DI Pipe and CI pipe?
Why concrete barriers have curved surface profiles?
Which are the top apps for you civil engineering?
What is specific gravity???
How can you produce desired alloys and discuss their applications in daily life.
what is the price of a cubic meter of concrete on international market?
What are wooden shingles?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.