Answer Posted / jigar soni
UNIT FOR S.B.C OF SOIL IS GENERALLY GIVEN AS TONNE/SQ.METER
IF REFER ANY STRUCTURAL DRAWING YOU WILL FIND THE SAME UNIT.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How much cement will require for 1Rmt Skirting laying
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
WHAT IS YOUR EXPECTED SALARY?
what is project?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
What is Refuse Area In High Rise Building ?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
What are segregation and bleeding?
How much does the leaning tower of pisa lean?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
Howmuch bend to be provide for 200/600 BEEM
What is the use of extend command?
What should be the standard roof height like to be?