If two transformers same rating(11KV / 440V)connected in the
same primary line(11KV), can we connect(bus coupler)
secondary side directly or need a synchronization????
Answer Posted / rajeshkumar k
no,if we want to connect the secondary side we need synchronization we have to match the v,phase sequence,f.if we use bc it wouldn't couple because efficency of transformer of same rating will differ, it should need synchronization.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is rating boiler
Define closed loop control system.
draw the full wave and half wave circuit of 3 phase system and inverter circuit used in ups
This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?
Why the efficiency of generator is more than motor in swinburne's test
The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?
in single phase converter, the no.of scr's conducting during overlap a)1 b)2 c)3 d)4
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
1hp= how much rpm
generally in LT and MV motors we are using 3.5Coresx16,25,35,50 etc cable for supply.although motors is earthed at two point and having all protection.then why we are using that 1/2 core for earthing the motors.while in HT cable we are using only 3core cable for motor supply.generally lt and mv motors are delta connected and ht motors having star connection.whethere it is having any relation with winding connection( star or delta).all motors i am talking about are dol only.can anybody solve my confusion.thanks...
What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
what is difference between bus coupler and auto transfer switch
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
How much earthing frequency is capable?