If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
Answer Posted / abdul kadir
4 Nos.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
sir, whitch is the best book (writer name) for prepration of gate....
what will happen if one could not properly follow the spacing of slab reinforcement bar?
How many types of slabs are there & how to design it?
For what building Built-on balconies are preferable? What are the advantages?
what mean By core Billing
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
how much cement and sand required for 1cum rr masonry
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
Define What is the difference between routing maintenance and major maintenance in school facilities?
Define block?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the likely strength of a 1:2:4 concrete mix?
what is the composition of good brick ?
List out some of the common problems that architect have to tackle it?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.