If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
Answer Posted / abdul kadir
4 Nos.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is the tensile strength of wood?
silt%= silt volume/ silt+sand volume is this right?
HOw much % of premium on DSR-2013 currently
How to calculate unit weight of concrete for m40 grade.
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
pls tell me about method of cutting length of ties column
Why should pumping be not used in case of concreting works?
What is Critical path in Ms-Project ?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
what could be the production cost of 1 cum of concrete by CP30 plant
yasser arfatcompleted his degree in civil from which university
The largest size of paper used in plotter to print the drawing made by Autocad .
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
why we use 19x9x9and 20x10x10 but not other
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need