Answer Posted / nagaraju
under no load condition we dont know the powerfacteor so the transimission rating is measered in kva but not in kw
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
What are the disadvantages of thermal power plant?
what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)
How I can Compare 120v/60Hz versus 220v/50Hz ? Please tell me both advantage and disadvantage ......
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
What is effect of harmonic current (Draw by VFD) on power system/ electrical Equipments ?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps
what is the purpose that we use PLC system in power system
Explain what is clipper and clamper circuits?
Why is tan-delta test and capacitor measurement done on alternator?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
why we have and use 3 phase not 2 or 4 or other in power system?