Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why transmiision rating in kva?

Answer Posted / nagaraju

under no load condition we dont know the powerfacteor so the transimission rating is measered in kva but not in kw

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?

2009


What are the disadvantages of thermal power plant?

1073


what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?

4523


What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)

1549


How I can Compare 120v/60Hz versus 220v/50Hz ? Please tell me both advantage and disadvantage ......

2009


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2016


If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables

1450


What is effect of harmonic current (Draw by VFD) on power system/ electrical Equipments ?

2049


I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.

1792


how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps

1241


what is the purpose that we use PLC system in power system

5045


Explain what is clipper and clamper circuits?

1151


Why is tan-delta test and capacitor measurement done on alternator?

2194


- two pumps must work with them at the same time but if the first pump start the second pump  must delayed for some time to start  also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it

2729


why we have and use 3 phase not 2 or 4 or other in power system?

2102