WHAT HAPPEN WHEN CT SECONDARY OPEN DURING LOAD
Answer Posted / sudhanva madhukar mahamuni
Mr. Amir Sharif
Mr. Ravi Siemens say that CT is step up transformer thats 100% rigth. Brief : Consider Primary winding as busbars having hundred / thousands of current and secondary as CT winding which have low current at its output and high voltage at its terminals. Hence its called as step up transformer. If CT terminals gets open then self induced emf will cut to its own winding i.e. CT and it will be uncontrollable and hence due to high voltage its insulation gets damage and CT will get burn.
Thanks to Siemens Mr. Amir Sharif is not there in SIEMENS.
Mr. Ravi keep going on dont upset due to such ans.
Mahamuni
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I want to ask that is there any relation between current denesity of copper and material purity. also is ther any standard which defines the standard current denesity of material.
What are the three major categories of error?
sir i want previous entrance exam papers for written test
Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
Define steady state error.
Why can't we parallel Voltage transformer secondary circuits?
Why AC current leads voltage in capacitor and how?
Is it true online ups having bypass mode if it is true then why we called ups because it is interrupting power when goes in bypass mode
ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine
What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?
Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028
what is the maintaining Cf in UPS.
explain working principle of earth leakage relay
What is reactance, reluctance,capistance, pls give answeer in hinglish and be simply Jo asani we smajh m aa jaye
how to maintain frenquncy with syncronising sub-station for distribution