Answer Posted / muthuvel
In Transmission of Electrical Power,There is no need of Single Phase Output.The neutral is required where ever the Single Phase output is required.And If it is Star system means
we are required to give Three phase Four wire It is economically not good.So only Power System Always having Delta System in Transmission and Star System in Distribution This is very small basics of Transmission and Distribution System.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
Show the schematic arrangement of diesel power station layout and give its principle of operation.
Metal covered multiconductor cables shall employ a marker tape located within the cable running for its complete length in lieu of cable surface marking. Is it true or false?
what is the IS foe lightning arrester?
Both generator parallel condition shared load equally but one genrator taking ampere more than the other what are all the causes to make like this
i am going to correct power factor of 1600kw induction motor,when i calculate capacitance of capacitor it is three time more in star connection than delta. if motor is star connected which connection i shall adopt for capacitors and reason for adopt this connection
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor
how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???
THERMAL CAPACITANCE IS MEASURED IN..................................................
What consists of 2 or more thermocouples to be connented series?
if the number of poles generated in stator and rotor side of an induction motor are different then what will happen and why?
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
What happens if the negative to earth voltage is greater than positive to earth voltage in the battery of substation?
I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
what is the difference between online & offline caliberation of KWH meters. Can Digital meters be caliberated
what transformer we used normally and upto which kva?