What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?

Answer Posted / g.karthik kumar

BBS MEANS BAR BENDING SCHEDULE.
SECOND OF QUESTION WRONG. THIS QUESTION ONLY MENTIONED ON
COLUMN SIZE AND COVER WIDTH.
NO MENTION ON COLUMN LENGTH.

Is This Answer Correct ?    34 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to make a c++ program that converts any base to base 10?

1614


Define What is rigging?

620


What are the types of slump?

629


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

1869


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

1713






what is the minimum compressive strength of clay brick

1752


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1206


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1770


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

4861


How can we convert weight batch to volume batch for m30 mix

2425


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1444


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

2626


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1092


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1877


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2496