What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / g.karthik kumar
BBS MEANS BAR BENDING SCHEDULE.
SECOND OF QUESTION WRONG. THIS QUESTION ONLY MENTIONED ON
COLUMN SIZE AND COVER WIDTH.
NO MENTION ON COLUMN LENGTH.
Is This Answer Correct ? | 34 Yes | 6 No |
Post New Answer View All Answers
How to make a c++ program that converts any base to base 10?
Define What is rigging?
What are the types of slump?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
what is the minimum compressive strength of clay brick
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
How can we convert weight batch to volume batch for m30 mix
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Use of coping on terrace wall and in 4" wall is compulsory or not ?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer