what is water cement ratio in design mix and its percentage
in concrete and mortar?
Answer Posted / engr sher chaudhry
water cement ratio in concrete and mix design is
0.45percent by weight of cement . But for mortar it depends
the type you need.
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
why we are useing plastic under the lean concrete?and whts the advantage?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
what is the weight of 12mm aggregates?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How much for the BRC lapping in full yield and half yield < and which table to get it ?
What are the RISKS during the project construction?
how much to get of BRC lapping in full yield and half yield ?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
What is Refuse Area In High Rise Building ?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?