what is the difference between red bricks& cement bricks
Answer Posted / sjtbehera
1. red bricks are less costiler than concrete block
2. it is more fire reisistance then concrete bricks
3. concrete bricks are heavier then red bricks
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
When column of building is abutting the boundary line,then suitable footing advised is
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
Rate analysis of Vitrified tile in cement mortor 1:3
what will happen if one could not properly follow the spacing of slab reinforcement bar?
What is bylayer?
What is geopolymer based concrete?