Short circuit current of 2500 KVA 11/0.415 KV transformer
both Secondary and primary side.
best regards.
Ali
Answer Posted / arun.r
WE NEED % IMPEDANCE OF TRANSFORMER FOR CALCULATION
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Why AC & DC capacitor are use in UPS ??????????????????
in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????
If ROC does not lies inside unit circle,then ? a) Fourier transform converges b) Z transform converges c) Hatly transform converges d) Colpit Transform converges.
star delta starter contorl circuit... drawing..
Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.
If o/p power is doubled by how much does the sound increase
sir pls tell me . our ct specifications are 120/5 ,2 core , 0.2 and 5p10 class , 30va and 30va buden. insted of 30 va i want use 15 va. can i use?
why industry prefer ht motor instead of lt motor.
Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?
What is fault clearing time for Current Limiting Moulded Case Circuit Breaker?.
Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?
high voltage transformer input voltage,current and amps rating..distributed transformer input voltage,current and amps rating...
How we calculate the Multiplying Factor of Kwh meter for 3 phase alternator.
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?