Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

up to what extwnt of voltage the celing fan works?

Answer Posted / manan bhatt

voltage should not be less than rated voltage ever for any
motor.
if for a few time over voltage of 10% tolerance is there it is
okay bcoz motor winding is capable to handle / sustain 155%
overload (or 255% full load) for few seconds

but for a safe operation rated voltage must be given.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

write down the formula of cable size in RM if current is 50Amp.

1323


The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?

2316


How can calculate the rating of a servo stabilizer for given a specific load

3500


what is the purpose of using filters in a protective relaying scheme?

2253


What do you mean by a current transformer?

1079


In three pin plug 6 amp. 220V ac rating. Why earth pin diameter is higher than other two pin? What its purpose ?

1208


what is the function of capacitor duty contactor in an capacitor panel???

4126


What is meant by vector group

2509


Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.

2573


How can we findout the maximum efficiancy of Transformer? At which load?

2063


WHY CBCT USE ONLY IN Y PHASE NOT OTHER PHASES

2087


how to calculate cooling requirement of datacentre from electrical load?

2389


What is the classification of hydro projects based on installed capacity?

1172


We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?

1628


DEFINE BREAKING CAPACITY OF BUSBAR & HOW IT IS CALCULATED?

5208