adspace
Answer Posted / ninad gaikwad
The best part of answer is already mentioned in
above i.e DATASHEET as well as HART communicator.
If you want to use DP Tx for level of tank then
range of DP Tx will be get From C-C distance of tank from
tapping, by using simple formula i.e: (height * density=
range). It means you will get range of DP transmitter for
level.
If you want to get the range for Flow. in that
case please check the orifice plate which is already
installed in line, you will get the range.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Can any one send me IOCL instrumentation question papers.. i dont know the pattern of the questions and what to prepare can any one help me on this .. my email id is anwarnishil@gmail.com
Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in
hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....
Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com
can any send me a forbes marshall dtron 316 manual
plz send me general of ongc
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
sir, give me placement papers and interview quistion of birla group company of copper.
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know
any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
this site is owned by an nonsense
use of split range ? where it is used ? in which control loop it is used ?