Answer Posted / taj
It should be M-1034.13 .
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Is it possible to make a feature using an overdefined sketch?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is a tensile strength? What is the tensile strength of wood?
what are the changes in concrete pour height as per IS 456, 2009?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
400 ku d/c clearess ketan hota hai?
What are the reasons for geotechnical site investigations in uganda?
How many % we consider for lap for reinforcement for estimates
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
can i get civil engineering test papers.......?????
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
how to find quantity of concrete in PCC M15
What is the sugested procedure of water purification for public supply?
Why do you want to work here
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15