how much brick,cement,and sand required in 1cum
brickwork(1:4)
Answer Posted / suman kumar
cement =1.15 bags
send = 9.18 cft
Brick = 500 nos
| Is This Answer Correct ? | 21 Yes | 30 No |
Post New Answer View All Answers
What is GSB gradation
Water filter calculation formula
what is differences between ferrock and concrete ?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What are the disadvantages while using stone dust as filler in pavements?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
Floor tile measurement? Wall to wall or skirting to skirting
How to plan a project
Define What are the reasons for geotechnical site investigations in Uganda?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
undistributed samples are obtained by
what will be price of 1:2:4pcc per kg?
what is the type of earthing