Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many bags 0f opc cement in 1 m³

Answer Posted / wajahat

if a single cement bag contain 50 kg than 34 bags will be required.

Is This Answer Correct ?    1 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is the release of lien?

1298


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1888


What is the average density of soil?

1320


What is the exception critarea of cube?

2580


.5Ast

1847


How much material is required for constructing a 2 Lane 2Km rigid pavement road

2257


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1936


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3519


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1788


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

2056


give me the rate analysis for Bituminous Macadam and SDBC

7486


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

2180


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

2157


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

2143


how to caliculate required amount of cement and sand required for 1cu.m.

2271