What is the difference between first angle projection and
third angle projection?
Answer Posted / adeniran ibrahim
In first angle the front view is alwys
above the plan while the plan is above
the front view in third angle projection.
Is This Answer Correct ? | 19 Yes | 6 No |
Post New Answer View All Answers
If specific gravity of cement is less than 3.15 what is the cause?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what is the maximum number of course that can be laid according to IS code and the max height.
What is Density of cement, sand & aggregate ?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
how to calculate weight of 1.8 cum of aggregate
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Which purpose we use deck anchor in bridges?
how much shouid be the rate for ready mix concrete per cubic meter
How to increase a bearing capacity of soil?
What are the problems one might face while having a Cantilever balcony?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
How much material is required for constructing a 2 Lane 2Km rigid pavement road