How much the fault level of 11 k.v.,22 k.v., 33 k.v.
(in Maharashtra- M.S.E.D.C.L) for calculation of short circuit
current & selection of h.t.cable.
Answer Posted / wareagle
the information you provided is not sufficient to answer
your question.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is a pilot wiring and whys that called a pilot wiers
how we do Vector group ,magnetic balance and tap changer test in Transformer?
Can we use Ccapacitive voltage transformer directly for metering purpose?
What is gross error?
full form of flry b
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
How to know any size of cable if there are not written on cable? Answer must be theurical not by experience.
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
Why do we avoid electrical conduits in floors at apartments?
I want definition for ABT Meter (Availability Based tariff) ?
Discuss the effect of sudden loading of an induction motor
explanation of mesh bus bars
i wasted one year for the job after completed my btech what can i say about 1year time in interview
For R-L or R-C ckt,time constant formula is L/R and RC respectively and its unit is in sec.Pls tell me the derivation
how open delta PT works & what is its construction?