for what perpuse we use CBR test in road project?

Answer Posted / rajasekhar chennuri

CBR main role is for finalisation of pavement thickness as
per PLATE-1 & PLATE-2 from IRC:37-2001

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2385


how to calculate the concrete mix m30 by volume

1090


What is difference between combin footing & rapt footing

1121


Which tests are performed on soil to decide the type of foundation to be provided.

1631


How are freeway bridges built?

843






A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

1546


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2595


Will going from a 3-tap to 6-tap increase water pressure?

643


How much time Required for PPR pipe network testing

1685


pls give me ans to ACT formula cube testing porpuse

2534


How many mortar required for Brickwork of 1 Cu.m works??

1046


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1604


How to fix toll charge for a particular vehicle at toll booths in a highway?

1489


Which is stronger solid steel rod or hollow steel pipe?

808


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

1796