Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I have a question, I visit 01 site and face a problem,
there is 2.5 ton Air Con working, when air con compressor
is running at that time rectifier voltages are increasing
upto 290-295 v and rectifier is giving main high alarm
(rectifier is APC single phase), before starting compressor
rectifier voltages was 230v. when air con is going off
rectifier voltages are decreasing smoothly at its actual
voltages 230v.

Load on Genset phases is this: Red-13.5 amp AC (Air Con
load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp
AC (telecom system load),
Genset phase to phase and neutral to phase voltages are
also ok.


These are 10 sites having same system and same rectifier
APC brand at every site 02 genset are working but the
problem is same at all these 10 sites.

What will be the reason behind???

Answer Posted / k.prakashchandra

Interchange the loads on the 3 phases

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the formula for calculating no-load current?

1146


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1398


A 11KV, 1200 A breaker combination fixed in a cubicle for HT motor.Is normally for 11 KV motor fuse is using? if Yes, What range fuse is required?

2026


whatis the commertial spec. of distribution boards ?

2132


CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS

1923


What is time invariant system?

1226


how to select the automotive wire size by mathematical calculation. for xenon headlamp with ballast. the ballast given data voltage 10-17v,current permenant 6amp, run up phase is 15amp, peak at swicth on max 400micro sec is 40amp.the sum of cable resistance is 150mohm.please provide referenc document if any for relating the peak at switch on current,time & wire wire size

2424


Electrical 'C' license full abbreviation , and full form

1955


Why do power lines not short out when they fall into water?

2053


what is auto re-closer?

2723


how to decide no of electrodes for 1600A LT Main incomer panel

1705


Define phase cross over?

1191


why moisture formation found in XLPE Armoured cable outer sheath

1884


how can we change the polarity of Alternating current rapidly? how frequency of ac can be controlled and changed easily?

2079


If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.