Answer Posted / muzammil khan
The excovation of any building depends
upon its nature and its location.
and it is also goverened by the type of soil
and the availibility of equipments.
Based on the above parameters we can
prepare the excovation plan.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are moment of inertia and its importance in civil engineering?
List out some of the software program that can be useful for architect?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
How much cement and water required for cement selery????
which has high compressive strength between hollow block and brick masonry?
why do we provide haunches in rcc box or underpasses?
How to plan a project
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How much does the leaning tower of pisa lean?
What is thumb rule for deep trench excavation
What do we mean by partial moment release ??
How cracks in concrete can be avoided?
Define What is a kip?