What is the difference between first angle projection and
third angle projection?
Answer Posted / sanjay raturi
first angle projection is top view is
bottom.
Third angle Projection is front View is bottom.
| Is This Answer Correct ? | 19 Yes | 10 No |
Post New Answer View All Answers
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How to determine thee cut length for steel reinforcement bars in R.C.C design
1m square 20mm plastering how much of water need curing work
all technical question
what is meant by csr in foundation? what is sbc?what is meant by contour line?
types of laps in column
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Can we use the flyash bricks in brick bat coba?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Which code is used for tor & tmt steel bar?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
what is Brest Wall?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you