Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between auto & dumpy level

Answer Posted / sjtbehera

i donot understand the question. auto and dumply level

Is This Answer Correct ?    5 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is c4x light weight cement blocks

5653


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1945


The definition of national highway

1808


what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

2276


How to marking the building

1931


which type of instrument included in plumbing work?name of instrument?

2130


What is meant by cad?

1033


Formula of mid span bar

1939


Draw the cross section of a boundary wall and label its part with detailing?

4608


Why the statue of liberty is made of copper?

1093


What is an ortho mode?

1219


List out the potential risk factors for workers on the construction site?

1074


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

1126


Name the main components of a cad gui?

1494


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2614