WHY WE R NOT USING THE TURBINE FLOW METER IN THE STREAM
SERVICE ? pl explain?
Answer Posted / shobha bhambe
as all we know steam have lighter density & steam flow can
be measured as mass flow not as volumetric flow. turbine
flow flow measures the vloumetric flow not mass flow.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the reset offset and control system in instrumentation
please someone tell me what is function of vibration sencer and how many types and how to control viberation.please. my id is jimmykhan077@gmail.com
Why flow/pressure transmitter before control valve?
what is interface level measurement.who can calibrate interface level measurement transmitter online
How d.p. Transmitter can be applied to close tank?
What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?
what is SIL 1 2 3
How it the difference between force balance system and dispalacement balance system?
Which type of diaphragm use in costic line, dm water line, natural gas line, oil line?
Can I route 110 VDC and 24 VDC in a same Duct for our Interposing relay cabinet? IF yes or NO Please provide me IEEE Std. for the same. Please i required it on Urgent basis, i need to design IRP Cabinets and we have MCC 110VDC and Our Coil side is 24VDC, Please help as soon as possible.
how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Where is wet leg is used?
what is isloted barrier how it works and what are the main purpose.how it make safe area.
Why mixer nd grinder Is example of constant torque load not variable torque load ???