Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why mostly conductor made by 7 nos wire?

Answer Posted / suman p.d dhakal

Easy to band and its gives more fexible.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why electronic instruments is more favorable than electrical?

1945


how to set the time in digital timer ?

2002


What are the different methodes for calculating the short circuit Current?

2034


State norton’s theorem?

1089


we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain

2203


differnce between single acting and double acting solenoid valves

1826


What is difference between isolator and circuit breaker?

1112


What is super thermal power plant? and how it will differ from normal thermal power plant

2263


1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?

2017


sir i had plane to do some project with the base of hopkinson test in AC supply its possible

1846


How to find out damper winding failure for synchronous machine?

1483


how is capacitor bank look like

2392


Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???

1941


What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?

2162


Parts of machine and their discription in details with suitable photo

2038